What has happened so far

1. main structural for chapel is erected.

2. started setting bar joists. Then we begin welding and detailing.

3. electrical sub-terrain conduit has been installed in the building pads as well as the new parking lot light poles.

4. all associated inspections have passed.

5. balance of concrete for columns and tie beams in the gym placed.

6. plumber has been advised that they can beginning underground.

7. most of the bank has been cut back to accommodate the retaining wall

8. most of the road base has been installed for the parking lot and driveway. once steel has erected and we get the equipment moved, we can then finish the road base.

10. all erosion control measures have been completed